Saturday, February 10, 2007

Floor Update #2

Today we made much more progress than we expected to. We didn't even start until about 6 pm. By midnight we had pulled up the entire kitchen floor. Mary took this photo of me after the first hour when we'd already torn up about 1/3 of the floor:


You can see the old linoleum on the left side of the photo, and the subfloor on the right side.

Shortly after this, my brother Craig came over with another shovel, crowbars, and other tools. First he helped us move the oven into the living room and the dishwasher into the garage. We were a little worried about the dishwasher because it had a solid copper pipe as its hot water supply. We were worried that in moving the dishwasher we might break the pipe. But the copper is pretty flexible and it gave just enough. We did have to turn off the hot water to the kitchen sink, however, so tomorrow we may be looking for a compression fitting cap at Lowe's.

We pulled up all the nails in the floor, then got down to pulling up the remaining 2/3 of the floor. By midnight we were done, and it was time for margaritas. Here is a photo of Craig and Mary after a blender full:



Tomorrow, it looks like we will be breaking up the ceramic tile in the entrance hallway. Some of it broke when we pulled up the kitchen floor. We have to make sure we have enough flooring for the hallway too, or we'll have to buy some more flooring. Right now, after a few margaritas, the math side of my brain isn't working properly, so we'll save that until tomorrow. We may also take the old floor to the dump tomorrow ... Milpitas has one of two free dump days tomorrow if it isn't raining. We also need to pick up the replacement pressboard at Lowe's, which will be difficult if it is raining. In any case, we hope to start laying the new floor on Monday.


No comments:

Post a Comment